Excavation Unit 1
|
Location
|
1-x-1 meter grid unit 767N 2210E. Southeast portion of the site. South of Structure 111.
|
Selection Criteria
|
Random. The one-hundred-twenty-second 1-x-1-m unit used for investigation into Nonstructure 106.
|
Excavation Strategy
|
Strata subdivided into arbitrary levels. Natural strata were subdivided into 10-cm arbitrary levels.
|
Unit Ends at
|
Undisturbed native sediment. Excavation terminated at approximately 80.61m below datum.
|
Study Unit(s) Associated with this Excavation Unit
|
Study Unit Type |
Study Unit Number |
Study Unit Description |
Arbitrary Unit
|
101
|
noncultural
|
Nonstructure
|
106
|
midden
|
Arbitrary Unit
|
113
|
noncultural
|
|
|
Excavation Unit 2
|
Location
|
1-x-1 meter grid unit 767N 2190E. Southeast portion of the site. South of Structure 111.
|
Selection Criteria
|
Random. The one-hundred-second 1-x-1-m unit used for investigation into Nonstructure 106.
|
Excavation Strategy
|
Strata subdivided into arbitrary levels. Natural strata were subdivided into 10-cm arbitrary levels.
|
Unit Ends at
|
Other. This excavation unit continued into Nonstructure 106, a midden deposit. Excavation was terminated before undisturbed native sediment was uncovered because human bone was found. The bone was disarticulated; no burial pit was observed. Excavation t
|
Study Unit(s) Associated with this Excavation Unit
|
Study Unit Type |
Study Unit Number |
Study Unit Description |
Arbitrary Unit
|
101
|
noncultural
|
Nonstructure
|
106
|
midden
|
|
|
Excavation Unit 3
|
Location
|
1-x-1 meter grid unit 771N 2196E. Southeast portion of the site. South of Structure 111.
|
Selection Criteria
|
Random. The two-hundred-fifth 1-x-1-m unit used for investigation into Nonstructure 106.
|
Excavation Strategy
|
Strata subdivided into arbitrary levels. Natural strata were subdivided into 10-cm arbitrary levels.
|
Unit Ends at
|
Undisturbed native sediment. Excavation terminated at approximately 81.64m below datum.
|
Study Unit(s) Associated with this Excavation Unit
|
Study Unit Type |
Study Unit Number |
Study Unit Description |
Arbitrary Unit
|
101
|
noncultural
|
Nonstructure
|
106
|
midden
|
Arbitrary Unit
|
113
|
noncultural
|
|
|
Excavation Unit 4
|
Location
|
1-x-1 meter grid unit 763N 2207E. Southeast portion of the site. South of Structure 111.
|
Selection Criteria
|
Random. The thirty-eighth 1-x-1-m unit used for investigation into Nonstructure 106.
|
Excavation Strategy
|
Strata subdivided into arbitrary levels. Natural strata were subdivided into 10-cm arbitrary levels.
|
Unit Ends at
|
Undisturbed native sediment. Excavation terminated at approximately 80.74m below datum.
|
Study Unit(s) Associated with this Excavation Unit
|
Study Unit Type |
Study Unit Number |
Study Unit Description |
Arbitrary Unit
|
101
|
noncultural
|
Nonstructure
|
106
|
midden
|
Arbitrary Unit
|
113
|
noncultural
|
|
|
Excavation Unit 5
|
Location
|
1-x-1 meter grid unit 770N 2212E. Southeast portion of the site. South of Structure 111.
|
Selection Criteria
|
Random. The one-hundred-ninety-fifth 1-x-1-m unit used for investigation into Nonstructure 106.
|
Excavation Strategy
|
Strata subdivided into arbitrary levels. Natural strata were subdivided into 10-cm arbitrary levels.
|
Unit Ends at
|
Undisturbed native sediment. Excavation terminated at approximately 80.52m below datum.
|
Study Unit(s) Associated with this Excavation Unit
|
Study Unit Type |
Study Unit Number |
Study Unit Description |
Arbitrary Unit
|
101
|
noncultural
|
Nonstructure
|
106
|
midden
|
Arbitrary Unit
|
113
|
noncultural
|
|
|
Excavation Unit 6
|
Location
|
1-x-1 meter grid unit 768N 2209E. Southeast portion of the site. South of Structure 111.
|
Selection Criteria
|
Random. The one-hundred-forty-fourth 1-x-1-m unit used for investigation into Nonstructure 106.
|
Excavation Strategy
|
Strata subdivided into arbitrary levels. Natural strata were subdivided into 10-cm arbitrary levels.
|
Unit Ends at
|
Undisturbed native sediment. Excavation terminated at approximately 80.72m below datum.
|
Study Unit(s) Associated with this Excavation Unit
|
Study Unit Type |
Study Unit Number |
Study Unit Description |
Arbitrary Unit
|
101
|
noncultural
|
Nonstructure
|
106
|
midden
|
Arbitrary Unit
|
113
|
noncultural
|
|
|
Excavation Unit 7
|
Location
|
1-x-1 meter grid unit 770N 2210E. Southeast portion of the site. South of Structure 111.
|
Selection Criteria
|
Random. The one-hundred-ninety-third 1-x-1-m unit used for investigation into Nonstructure 106.
|
Excavation Strategy
|
Strata subdivided into arbitrary levels. Natural strata were subdivided into 10-cm arbitrary levels.
|
Unit Ends at
|
Undisturbed native sediment. Excavation terminated at approximately 80.67m below datum.
|
Study Unit(s) Associated with this Excavation Unit
|
Study Unit Type |
Study Unit Number |
Study Unit Description |
Arbitrary Unit
|
101
|
noncultural
|
Nonstructure
|
106
|
midden
|
Arbitrary Unit
|
113
|
noncultural
|
|
|
Excavation Unit 8
|
Location
|
1-x-1 meter grid unit 771N 2208E. Southeast portion of the site. South of Structure 111.
|
Selection Criteria
|
Random. The two-hundred-sixteenth 1-x-1-m unit used for investigation into Nonstructure 106.
|
Excavation Strategy
|
Strata subdivided into arbitrary levels. Natural strata were subdivided into 10-cm arbitrary levels.
|
Unit Ends at
|
Undisturbed native sediment. Excavation terminated at approximately 80.82m below datum.
|
Study Unit(s) Associated with this Excavation Unit
|
Study Unit Type |
Study Unit Number |
Study Unit Description |
Arbitrary Unit
|
101
|
noncultural
|
Nonstructure
|
106
|
midden
|
Arbitrary Unit
|
113
|
noncultural
|
|
|
Excavation Unit 9
|
Location
|
1-x-1 meter grid unit 767N 2205E. Southeast portion of the site. South of Structure 111.
|
Selection Criteria
|
Random. The one-hundred-seventeenth 1-x-1-m unit used for investigation into Nonstructure 106.
|
Excavation Strategy
|
Strata subdivided into arbitrary levels. Natural strata were subdivided into 10-cm arbitrary levels.
|
Unit Ends at
|
Undisturbed native sediment. Excavation terminated at approximately 81.07m below datum.
|
Study Unit(s) Associated with this Excavation Unit
|
Study Unit Type |
Study Unit Number |
Study Unit Description |
Arbitrary Unit
|
101
|
noncultural
|
Nonstructure
|
106
|
midden
|
Arbitrary Unit
|
113
|
noncultural
|
|
|
Excavation Unit 10
|
Location
|
1-x-1 meter grid unit 766N 2202E. Southeast portion of the site. South of Structure 111.
|
Selection Criteria
|
Random. The ninety-first 1-x-1-m unit used for investigation into Nonstructure 106.
|
Excavation Strategy
|
Strata subdivided into arbitrary levels. Natural strata were subdivided into 10-cm arbitrary levels.
|
Unit Ends at
|
Undisturbed native sediment. Excavation terminated at approximately 81.34m below datum.
|
Study Unit(s) Associated with this Excavation Unit
|
Study Unit Type |
Study Unit Number |
Study Unit Description |
Arbitrary Unit
|
101
|
noncultural
|
Nonstructure
|
106
|
midden
|
Arbitrary Unit
|
113
|
noncultural
|
|
|
Excavation Unit 11
|
Location
|
1-x-1 meter grid unit 771N 2205E. Southeast portion of the site. South of Structure 111.
|
Selection Criteria
|
Random. The two-hundred-thirteenth 1-x-1-m unit used for investigation into Nonstructure 106.
|
Excavation Strategy
|
Strata subdivided into arbitrary levels. Natural strata were subdivided into 10-cm arbitrary levels.
|
Unit Ends at
|
Undisturbed native sediment. Excavation terminated at approximately 81.09m below datum.
|
Study Unit(s) Associated with this Excavation Unit
|
Study Unit Type |
Study Unit Number |
Study Unit Description |
Arbitrary Unit
|
101
|
noncultural
|
Nonstructure
|
106
|
midden
|
Arbitrary Unit
|
113
|
noncultural
|
|
|
Excavation Unit 12
|
Location
|
1-x-1 meter grid unit 769N 2192E. Southeast portion of the site. South of Structure 111.
|
Selection Criteria
|
Random. The one-hundred-fifty-first 1-x-1-m unit used for investigation into Nonstructure 106.
|
Excavation Strategy
|
Strata subdivided into arbitrary levels. Natural strata were subdivided into 10-cm arbitrary levels.
|
Unit Ends at
|
Fill continued. Fill continued into Nonstructure 106, at which point excavation was terminated due to finding disarticulated human remains. Excavation terminated at approximately 82.17m below datum.
|
Study Unit(s) Associated with this Excavation Unit
|
Study Unit Type |
Study Unit Number |
Study Unit Description |
Arbitrary Unit
|
101
|
noncultural
|
Nonstructure
|
106
|
midden
|
|
|
Excavation Unit 13
|
Location
|
1-x-1 meter grid unit 775N 2195E. Southeast portion of the site. South of Structure 111.
|
Selection Criteria
|
Random. The two-hundred-ninety-second 1-x-1-m unit used for investigation into Nonstructure 106.
|
Excavation Strategy
|
Strata subdivided into arbitrary levels. Natural strata were subdivided into 10-cm arbitrary levels.
|
Unit Ends at
|
Undisturbed native sediment. Excavation terminated at approximately 82.05m below datum.
|
Study Unit(s) Associated with this Excavation Unit
|
Study Unit Type |
Study Unit Number |
Study Unit Description |
Arbitrary Unit
|
101
|
noncultural
|
Nonstructure
|
106
|
midden
|
Arbitrary Unit
|
113
|
noncultural
|
|
|
Excavation Unit 14
|
Location
|
1-x-1 meter grid unit 765N 2203E. Southeast portion of the site. South of Structure 111.
|
Selection Criteria
|
Random. The seventieth 1-x-1-m unit used for investigation into Nonstructure 106.
|
Excavation Strategy
|
Strata subdivided into arbitrary levels. Natural strata were subdivided into 10-cm arbitrary levels.
|
Unit Ends at
|
Undisturbed native sediment. Excavation terminated at approximately 81.22m below datum.
|
Study Unit(s) Associated with this Excavation Unit
|
Study Unit Type |
Study Unit Number |
Study Unit Description |
Arbitrary Unit
|
101
|
noncultural
|
Nonstructure
|
106
|
midden
|
Arbitrary Unit
|
113
|
noncultural
|
|
|
Excavation Unit 15
|
Location
|
1-x-1 meter grid unit 776N 2212E. Southeast portion of the site. South of Structure 111.
|
Selection Criteria
|
Random. The three-hundred-twenty-sixth 1-x-1-m unit used for investigation into Nonstructure 106.
|
Excavation Strategy
|
Strata subdivided into arbitrary levels. Natural strata were subdivided into 10-cm arbitrary levels.
|
Unit Ends at
|
Undisturbed native sediment. Excavation terminated at approximately 80.73m below datum.
|
Study Unit(s) Associated with this Excavation Unit
|
Study Unit Type |
Study Unit Number |
Study Unit Description |
Arbitrary Unit
|
101
|
noncultural
|
Nonstructure
|
106
|
midden
|
Arbitrary Unit
|
113
|
noncultural
|
|
|
Excavation Unit 16
|
Location
|
1-x-1 meter grid unit 776N 2204E. Southeast portion of the site. South of Structure 111.
|
Selection Criteria
|
Random. The three-hundred-nineteenth 1-x-1-m unit used for investigation into Nonstructure 106.
|
Excavation Strategy
|
Strata subdivided into arbitrary levels. Natural strata were subdivided into 10-cm arbitrary levels.
|
Unit Ends at
|
Undisturbed native sediment. Excavation terminated at approximately 81.33m below datum.
|
Study Unit(s) Associated with this Excavation Unit
|
Study Unit Type |
Study Unit Number |
Study Unit Description |
Arbitrary Unit
|
101
|
noncultural
|
Nonstructure
|
106
|
midden
|
Arbitrary Unit
|
113
|
noncultural
|
|
|
Excavation Unit 17
|
Location
|
1-x-1 meter grid unit 774N 2198E. Southeast portion of the site. South of Structure 111.
|
Selection Criteria
|
Random. The two-hundred-seventy-sixth 1-x-1-m unit used for investigation into Nonstructure 106.
|
Excavation Strategy
|
Strata subdivided into arbitrary levels. Natural strata were subdivided into 10-cm arbitrary levels.
|
Unit Ends at
|
Undisturbed native sediment. Excavation terminated at approximately 81.85m below datum.
|
Study Unit(s) Associated with this Excavation Unit
|
Study Unit Type |
Study Unit Number |
Study Unit Description |
Arbitrary Unit
|
101
|
noncultural
|
Nonstructure
|
106
|
midden
|
Arbitrary Unit
|
113
|
noncultural
|
|
|
Excavation Unit 18
|
Location
|
1-x-3 meter grid unit, long axis oriented north-south 793N 2190E. North portion of the site. This excavation unit was used to excavate Structure 111.
|
Selection Criteria
|
Judgmental. A 3-x-1-m unit was used to investigate a rubble mound, and possible roomblock.
|
Excavation Strategy
|
Natural strata.
|
Unit Ends at
|
Structure floor. Excavation terminated at approximately 82.81m below datum.
|
Study Unit(s) Associated with this Excavation Unit
|
Study Unit Type |
Study Unit Number |
Study Unit Description |
Arbitrary Unit
|
101
|
noncultural
|
Structure
|
111
|
masonry surface structure
|
Arbitrary Unit
|
113
|
noncultural
|
Nonstructure
|
114
|
extramural surface
|
|
|
Excavation Unit 19
|
Location
|
Segment 1 (17.11m east-west, 1.0m north-south.). Central portion of the site. South of Structure 111.
|
Selection Criteria
|
Judgmental. Segment 1 was used to investigate the post likely location of a kiva, and to assess the degree to which the site had been mechanically disturbed.
|
Excavation Strategy
|
Other. A backhoe was used to excavate Segment 1.
|
Unit Ends at
|
Bedrock. The backhoe excavated Segment 1 in a full cut, down to bedrock at which point excavation terminated. Excavation terminated at approximately 80.92m below datum.
|
Study Unit(s) Associated with this Excavation Unit
|
Study Unit Type |
Study Unit Number |
Study Unit Description |
Arbitrary Unit
|
102
|
noncultural
|
Arbitrary Unit
|
103
|
noncultural
|
|
|
Excavation Unit 20
|
Location
|
2-x-2 meter grid unit 787N 2195E. Central portion of the site. North of Segment 1 and southeast of Structure 111.
|
Selection Criteria
|
Judgmental. The 2-x-2-m unit was used to investigate a possible Basketmaker III pit feature.
|
Excavation Strategy
|
Strata subdivided into arbitrary levels.
|
Unit Ends at
|
Undisturbed native sediment. Excavation terminated at approximately 82.14m below datum.
|
Study Unit(s) Associated with this Excavation Unit
|
Study Unit Type |
Study Unit Number |
Study Unit Description |
Arbitrary Unit
|
101
|
noncultural
|
Arbitrary Unit
|
102
|
noncultural
|
Arbitrary Unit
|
112
|
not further specified
|
Arbitrary Unit
|
113
|
noncultural
|
|
|
Excavation Unit 21
|
Location
|
1-x-1 meter grid unit 760.5N 2175.5E. Western portion of the site. Southwest of Structure 111.
|
Selection Criteria
|
Judgmental. The 1-x-1-m unit was used to investigate a possible slab-lined feature.
|
Excavation Strategy
|
Natural strata.
|
Unit Ends at
|
Undisturbed native sediment. Excavation terminated at approximately 81.61m below datum.
|
Study Unit(s) Associated with this Excavation Unit
|
Study Unit Type |
Study Unit Number |
Study Unit Description |
Arbitrary Unit
|
107
|
noncultural
|
Nonstructure
|
108
|
not further specified
|
Nonstructure
|
109
|
extramural surface
|
Nonstructure
|
110
|
not further specified
|
Arbitrary Unit
|
113
|